Applied solutions

Pumping station

 

Pumping station parameters:

 

  • flow [Q] = 1.38 l / s
  • lifting height = 4.25 [m]

Hydraulic system:

 

  • submersible pump IS 50 T (CAT.NO. A414-050-0004-06) P1 / P2 = 0.495 / 0.37 kW, In = 0.9 A – 2 pcs.
  • piping DN 50 made of steel 1.4301, connected on flanges (PN = 10 stainless steel)

Elements:

 

  • soft-sealed valve DN 50– 2 pcs.
  • ball check valve DN 50 – 2 pcs.
  • parallel operation of pumps, technological sewage
  • EU control cabinet, mounted on the tank cover. Equipped with, among others with SG / 25S / 0-4 / L = 10m hydrostatic probe + SG type handle, 2 floats. Optical and acoustic signaling of emergency states.

Concrete chamber:

 

  • diameter 1500 mm
  • height h = 4.9 m

Applied solutions

EPS pumping station

 

Pumping station parameters:

 

  • flow [Q] = 701.00 l/s
  • lifting height = 8.60 [m]

Hydraulic system:

 

  • submersible pump XFP 305J-CB2.377 PE 370/6 P1 / P2 = 39.74 / 37.0 kW, In = 70.0 A – 2 pcs.
  • piping DN 400 made of steel 1.4301, connected on flanges (PN = 10 stainless steel)

Elements:

 

  • soft-sealed valve DN 400– 2 pcs.
  • ball check valve DN 400 – 2 pcs.
  • parallel pump operation, rainwater sewage
  • EU control cabinet, mounted on the tank cover. Equipped with, among others with SG / 250 / O-4 / L = 18 m hydrostatic probe + SG type handle, 2 floats. Optical-acoustic signaling of emergency states, with the possibility of disconnecting an acoustic signal, sending alarm messages (SMS) to mobile phones.

Concrete chamber::

 

  • diameter = 6000 mm
  • height h = 8.25 m

Applied solutions

The value of the investment, which lasted about 1 year, is  5 457 404 PLN. The contract was carried out by the Technological Execution Department of the Ecol-Serwis Division.

 

The investment of reconstruction of the pumping station was implemented by the Mrągowo Commune with the participation of EU funds under the project: “Modernization and expansion of sewage and water supply systems of the Mrągowo agglomeration under measure 2.3” Water and sewage management in agglomerations “priority axis II” Environmental protection, including adaptation to climate change “Operational Program Infrastructure and Environment 2014 – 2020.”

As part of the task, works related to the assembly of modern technological, electrical and I&C installations were completed. The works also included the delivery and assembly of pumps with a capacity of Q = 450 m3/h and a power of P = 75 kW and pipelines made of AISI 316L steel, construction of a ventilation and heating system based on heating and ventilation units.

 

A video monitoring system with an alarm system and data transmission was also installed. The pumping station serves the entire city of Mrągowo, therefore all works were carried out with the uninterrupted operation of the pumping station using emergency systems. All technological and sanitary works were carried out without the participation of subcontractors. Installation capacity H = 125 l/s, H = 56 m.

Applied solutions

  • renovation of the metal body (sandblasting, painting),
  • replacement of the entire facility equipment,
  • flowmeter chamber has been added,
  • connecting the facility to the monitoring system.