Search

Applied solutions

High-efficiency coalescence separator ESK 20

 

  • Total capacity – 20 dm3/h
  • Total weight – 3100 kg
  • Weight of the heaviest element -2300 kg
  • Oil storage volume – 480 dm3
  • Diameter of inlet/outlet DN – 200 mm
  • Diameter – 1200 mm

Applied solutions

Settling tank EOS 2000 x 1:

 

  • Active volume – 5 m3
  • Total weight – 10750 kg
  • Sediment layer thickness – 80 cm
  • Diameter of inlet/outlet DN – 1000 mm
  • Diameter – 2000 mm

High-efficiency coalescence separator ESK-BH II 6/60/1200/250:

 

  • Total capacity – 15 dm3/s
  • Total weight – 3400 kg
  • Weight of the heaviest element -3300 kg
  • Oil storage volume – 220 dm3
  • Diameter of inlet/outlet DN – 250 mm
  • Diameter – 1200 mm

High-efficiency coalescence separator ESK 15:

 

  • Total capacity – 15 dm3/s
  • Total weight – 2900 kg
  • Weight of the heaviest element -2200 kg
  • Oil storage volume – 480 dm3
  • Diameter of inlet/outlet DN – 200 mm
  • Diameter – 1200 mm

Applied solutions

Further success in Lithuania. Together with strategic partner Prespa, Ecol-Unicon was honored to supply a brand new rainwater treatment line for Boar Crossing between Lithuania and Belarus. Construction works should be ended within the next few months but three sets of settling tanks and high-efficiency separators are ready to serve with good faith and fidelity to protecting the environment.

Settling tank EOS 2000 x 3

High-efficiency coalescence separator ESK 100 x 2:

 

  • Total capacity – 100 dm3/h
  • Total weight – 8200 kg
  • Weight of the heaviest element – 6300 kg
  • Oil storage volume – 1900 dm3
  • Diameter of inlet/outlet DN – 315 mm
  • Diameter – 2000 mm

High-efficiency coalescence separator ESK 80 x 1:

 

  • Total capacity – 80 dm3/h
  • Total weight – 8200 kg
  • Weight of the heaviest element – 6300 kg
  • Oil storage volume – 1900 dm3
  • Diameter of inlet/outlet DN – 315 mm
  • Diameter – 2000 mm

Project details

Works on the construction of the Bar-Boljare highway (169.2 km) officially started on May 11, 2015. The construction of the priority section Smokovac – Uvač – Mateševo ​​was planned for four years. According to official information, the contractor was to complete the construction of a 41-kilometer section with 45 bridges and flyovers and 32 tunnels within 48 months. More information about the project can be found here more.

Our partner from Bosnia and Herzegovina – manufacturer of concrete products BINIS, supplied for the aforementioned project approximately 30 coalescence separators with a nominal flow of 40 to 150 l/s using technological equipment from Ecol-Unicon, among various road construction products of their own production. We are very proud to cooperate with such a partner and to have an opportunity to use our products in such huge projects.

 

Scope of delivery: 30 coalescence separators (including separators with bypass), nominal flow from 40 to 150 l/s, manufacturer of the ESK and ESK-BII technological equipment for separators- Ecol-Unicon, manufacturer of concrete chambers – Binis, Bosnia and Herzegovina.