Desc
Construction of a pumping station for the Water Park in Ciechocinek. Due to the location of the pumping station, it was made to a high quality and visual standard.
Applied solutions
Pumping station
Pumping station parameters:
- flow [Q] = 1.38 l / s
- lifting height = 4.25 [m]
Hydraulic system:
- submersible pump IS 50 T (CAT.NO. A414-050-0004-06) P1 / P2 = 0.495 / 0.37 kW, In = 0.9 A – 2 pcs.
- piping DN 50 made of steel 1.4301, connected on flanges (PN = 10 stainless steel)
Elements:
- soft-sealed valve DN 50– 2 pcs.
- ball check valve DN 50 – 2 pcs.
- parallel operation of pumps, technological sewage
- EU control cabinet, mounted on the tank cover. Equipped with, among others with SG / 25S / 0-4 / L = 10m hydrostatic probe + SG type handle, 2 floats. Optical and acoustic signaling of emergency states.
Concrete chamber:
- diameter 1500 mm
- height h = 4.9 m